=== Definition ===
 
=== Definition ===
 
{{#set:definition=a deliverable oriented hierarchical representation of the total scope of the project, and [...] a fundamental means to identify and manage the proper planning level and interface with the SJU (SESAR Joint Undertaking).}}
 
{{#set:definition=a deliverable oriented hierarchical representation of the total scope of the project, and [...] a fundamental means to identify and manage the proper planning level and interface with the SJU (SESAR Joint Undertaking).}}
{{#ask: [[Project Work Breakdown Structure]] | ?definition= }}
+
{{#ask: [[Project Work Breakdown Structure]] | ?definition= |mainlabel=- }}
  
 
=== Definition Source ===
 
=== Definition Source ===
 
{{#set:defsource=SESAR (2015), WP & Project Management Execution Guidelines, Ed. 02.02.00}}
 
{{#set:defsource=SESAR (2015), WP & Project Management Execution Guidelines, Ed. 02.02.00}}
{{#ask: [[Project Work Breakdown Structure]] | ?defsource= }}
+
{{#ask: [[Project Work Breakdown Structure]] | ?defsource= |mainlabel=- }}
  
 
=== Note ===
 
=== Note ===
 
{{#set:note=}}
 
{{#set:note=}}
{{#ask: [[Project Work Breakdown Structure]] | ?note= }}
+
{{#ask: [[Project Work Breakdown Structure]] | ?note= |mainlabel=- }}
  
 
=== Lexicon Release ===
 
=== Lexicon Release ===

Latest revision as of 13:34, 5 July 2016

Link Semantic Value
Term Project Work Breakdown Structure
Status


Mandatory for


Contexts

SESAR

Categories
Synonyms


Related entries


Broader term


Narrower term


Abbreviation

Definition

a deliverable oriented hierarchical representation of the total scope of the project, and [...] a fundamental means to identify and manage the proper planning level and interface with the SJU (SESAR Joint Undertaking).

Definition Source

SESAR (2015), WP & Project Management Execution Guidelines, Ed. 02.02.00

Note