Difference between revisions of "Low Capacity Needs TMAs"

From EUROCONTROL ATM Lexicon
Jump to: navigation, search
[checked revision][checked revision]
(reviewed)
 
Line 18: Line 18:
 
=== Abbreviation ===
 
=== Abbreviation ===
 
{{#set:abbreviation= }}
 
{{#set:abbreviation= }}
{{#ask: [[Low Capacity Needs TMAs]] | ?abbreviation= }}
+
{{#ask: [[Low Capacity Needs TMAs]] | ?abbreviation= |mainlabel=- }}
 
=== Definition ===
 
=== Definition ===
 
{{#set:definition=TMAs with less than 30 movements by hour in peak hour and with a % increase over time of less than 50%.}}
 
{{#set:definition=TMAs with less than 30 movements by hour in peak hour and with a % increase over time of less than 50%.}}
{{#ask: [[Low Capacity Needs TMAs]] | ?definition= }}
+
{{#ask: [[Low Capacity Needs TMAs]] | ?definition= |mainlabel=- }}
  
 
=== Definition Source ===
 
=== Definition Source ===
 
{{#set:defsource=SESAR Performance Plan (pan-European regional and national) for ATM-MP Ed. 3 (D02, Ed. 01.00.03, 2015)}}
 
{{#set:defsource=SESAR Performance Plan (pan-European regional and national) for ATM-MP Ed. 3 (D02, Ed. 01.00.03, 2015)}}
{{#ask: [[Low Capacity Needs TMAs]] | ?defsource= }}
+
{{#ask: [[Low Capacity Needs TMAs]] | ?defsource= |mainlabel=- }}
  
 
=== Note ===
 
=== Note ===
 
{{#set:note=}}
 
{{#set:note=}}
{{#ask: [[Low Capacity Needs TMAs]] | ?note= }}
+
{{#ask: [[Low Capacity Needs TMAs]] | ?note= |mainlabel=- }}
  
 
=== Lexicon Release ===
 
=== Lexicon Release ===

Latest revision as of 13:33, 5 July 2016

Link Semantic Value
Term Low Capacity Needs TMAs
Status


Mandatory for


Contexts

SESAR

Categories
Synonyms


Related entries

High Capacity Needs TMAs

Medium Capacity Needs TMAs

Broader term


Narrower term


Abbreviation

Definition

TMAs with less than 30 movements by hour in peak hour and with a % increase over time of less than 50%.

Definition Source

SESAR Performance Plan (pan-European regional and national) for ATM-MP Ed. 3 (D02, Ed. 01.00.03, 2015)

Note

Lexicon Release

Lexicon Release 2015.1