Difference between revisions of "Initial Reference Business or Mission Trajectory"

From EUROCONTROL ATM Lexicon
Jump to: navigation, search
[unchecked revision][unchecked revision]
(Created page with '{{semantic_table |term=Initial Reference Business or Mission Trajectory |status= |mandatory= |synonyms= |categories=<noinclude>Category:Common</noinclude> |contexts=[[C…')
 
Line 6: Line 6:
 
  |categories=<noinclude>[[Category:Common]]</noinclude>
 
  |categories=<noinclude>[[Category:Common]]</noinclude>
 
  |contexts=[[Context::SESAR]]
 
  |contexts=[[Context::SESAR]]
  |related_entries=
+
  |related_entries=[[Initial Shared Business or Mission Trajectory]] (iSB/MT)
 
  |broader_terms=
 
  |broader_terms=
 
  |narrower_terms=
 
  |narrower_terms=

Revision as of 12:34, 12 June 2015

Link Semantic Value
Term Initial Reference Business or Mission Trajectory
Status


Mandatory for


Contexts

SESAR

Categories
Synonyms


Related entries

Initial Shared Business or Mission Trajectory (iSB/MT)

Broader term


Narrower term


Abbreviation

  
Initial Reference Business or Mission TrajectoryiRB/MT

Definition

  
Initial Reference Business or Mission TrajectoryThe Reference Business or Mission Trajectory which does not contain in Step 1 all the necessary elements to enable the full implementation of Trajectory Based Operation that will be in use during Step 2, among others ground routing is not an integrated part of the iRB/MT.

Definition Source

  
Initial Reference Business or Mission TrajectorySESAR Concept of Operations Step 1 Edition 2013 (Ed. 01.02.00)

Note

  
Initial Reference Business or Mission Trajectory