High Capacity Needs ACCs

From EUROCONTROL ATM Lexicon
Revision as of 15:57, 29 July 2015 by Ipigur (Talk | contribs) (reviewed)


Jump to: navigation, search
Link Semantic Value
Term High Capacity Needs ACCs
Status


Mandatory for


Contexts

SESAR

Categories
Synonyms


Related entries

Medium Capacity Needs ACCs

Low Capacity Needs ACCs

En Route Performance Gap

Broader term


Narrower term


Abbreviation

  
High Capacity Needs ACCs

Definition

  
High Capacity Needs ACCsACCs with an En Route performance gap and with more than 250 movements in peak hour, or ACCs with an En Route performance gap, with movements between 150 and 250 in peak hour, and with a % increase over time more than 50%.

Definition Source

  
High Capacity Needs ACCsSESAR Performance Plan (pan-European regional and national) for ATM-MP Ed. 3 (D02, Ed. 01.00.03, 2015)

Note

  
High Capacity Needs ACCs

Lexicon Release

Lexicon Release 2015.1