View source for FullDescription:SESAR
You do not have permission to edit this page, for the following reason:
You can view and copy the source of this page.
Templates used on this page:
- 4D Contract (view source)
- 4D Trajectory (view source)
- 4DWxCube (view source)
- ADS-C ETA min/max report (view source)
- ADS-C Extended Projected Profile (view source)
- ASAS-Crossing and Passing (view source)
- ASAS-Self Separation (view source)
- ASAS-Separation (view source)
- ASAS-Sequencing and Merging (view source)
- ASAS-Spacing (view source)
- ATFM slot swapping (view source)
- ATM Sub-Functionality (view source)
- ATM Technology Change (view source)
- ATM community (view source)
- ATM constraint (view source)
- ATM functionality (view source)
- ATM functionality deployment target date (view source)
- Activity (view source)
- Actor (view source)
- Actual Commence of Ground Handling Time (view source)
- Actual Commencement of De-icing Time (view source)
- Actual De-icing Time (view source)
- Actual End of De-icing Time (view source)
- Actual End of Ground handling Time (view source)
- Actual Ground Handling Time (view source)
- Actual In-Block Time (view source)
- Actual Off-Block Time (view source)
- Actual Ready Time (view source)
- Actual Ready for De-icing Time (view source)
- Actual Start Boarding Time (view source)
- Actual Start Up Approval Time (view source)
- Actual Start Up Request Time (view source)
- Actual Take-Off Time (view source)
- Actual Taxi-In Time (view source)
- Actual Taxi-Out Time (view source)
- Actual Turn-round Time (view source)
- Actual landing time (view source)
- Advanced Continuous Climb Operation (view source)
- Advanced Continuous Descent Operation (view source)
- Advanced Flexible Use of Airspace (view source)
- Advanced Surface Movement Guidance and Control System (view source)
- Adverse conditions (view source)
- Adverse weather conditions (view source)
- Aerodrome Flight Information Service (2) (view source)
- Aerodrome Movement Area (view source)
- Aeronautical Information Service (view source)
- Aeronautical data (view source)
- Aeronautical telecommunication network (view source)
- Aggregation hierarchy (view source)
- Air Traffic Flow Management (view source)
- Air Traffic Management Operational Concept (view source)
- Air Traffic Service Route Segment (view source)
- Air traffic control (view source)
- Air traffic control clearance (view source)
- Air traffic control instruction (view source)
- Air traffic control service (view source)
- Air traffic management (view source)
- Air traffic management system (view source)
- Airborne delay (view source)
- Aircraft Intent (view source)
- Aircraft operating costs (view source)
- Aircraft ownership cost (view source)
- Airport Collaborative Decision Making (view source)
- Airport Operations Centre (view source)
- Airport Operations Plan (view source)
- Airport Performance Gap (view source)
- Airport Transit View (view source)
- Airports % increase over time (view source)
- Airports Peak movements/hour (view source)
- Airspace (view source)
- Airspace Building Block (view source)
- Airspace Reservation/Restriction (view source)
- Airspace User (view source)
- Airspace management (view source)
- Airspace restriction (view source)
- Application (view source)
- Approach (view source)
- Architectural Description (view source)
- Architectural Product (view source)
- Architecture (view source)
- Architecture Framework (view source)
- Architecture Governance (view source)
- Architecture principles (view source)
- Area Control Centres % increase over time (view source)
- Area Control Centres Peak movements/hour (view source)
- Arrival (view source)
- Arrival Free Interval (view source)
- Arrival Manager (view source)
- Assemble (view source)
- Assessment of costs and benefits (view source)
- Asset life (view source)
- Automatic Dependent Surveillance-Broadcast (view source)
- Automatic Dependent Surveillance-Contract (view source)
- Baseline performance (view source)
- Baseline scenario (view source)
- Benefit (view source)
- Benefit category (view source)
- Benefit mechanism (view source)
- Benefit uncertainties (view source)
- Block hour (view source)
- Business Application (view source)
- Business Interaction (view source)
- Business Model (view source)
- Business Rule (view source)
- Business Trajectory (view source)
- Business aviation (view source)
- Business or Mission Development Trajectory (view source)
- Business or Mission Trajectory (view source)
- Calculated Take-Off Time (view source)
- Capability (view source)
- Capability Configuration (view source)
- Cargo load factor (view source)
- Cash flow (view source)
- Classification scheme (view source)
- Cleared route (view source)
- Climb (view source)
- Climb Cruise Operations (view source)
- Closed Loop Clearance (view source)
- Collaborative Decision Making (view source)
- Combined Vision System (view source)
- Complexity (view source)
- Concept of operations (view source)
- Concern (view source)
- Constraint (view source)
- Continuous Climb Operation (view source)
- Continuous descent operation (view source)
- Control Gate (view source)
- Controlled Time Over (view source)
- Controlled Time of Arrival (view source)
- Controller Intent (view source)
- Controller Working Position (view source)
- Controller-pilot data link communications (view source)
- Cooperative separation (view source)
- Core Data Warehouse (view source)
- Cost category (view source)
- Cost mechanism (view source)
- Cost of distance flown (view source)
- Cruise (view source)
- Data Element (view source)
- Data link-automatic terminal information service (view source)
- Data mart (view source)
- Data product (view source)
- Data type (view source)
- Data warehouse (view source)
- Delay cost (view source)
- Density (view source)
- Department of Defense Architecture Framework (view source)
- Departure Manager (view source)
- Deployment Baseline (view source)
- Deployment Package (view source)
- Deployment scenario (view source)
- Device (view source)
- Direct Routing (view source)
- Direct Routing Airspace (view source)
- Disruptive weather condition (view source)
- Domain (view source)
- Domain System (view source)
- Dynamic (Route) Allocation (view source)
- Dynamic Mobile Area (view source)
- EPP data (view source)
- ESSIP Objective (view source)
- ETA min/max (view source)
- En Route Performance Gap (view source)
- Enabler (view source)
- Enabler FOC date (view source)
- Enabler IOC date (view source)
- Enabler end of deployment (view source)
- Enabler start of deployment (view source)
- Enhanced Braking Systems (view source)
- Enhanced Vision System (view source)
- Enterprise phase (view source)
- Essential Operational Change (view source)
- Estimated Commencement of De-icing Time (view source)
- Estimated De-icing Time (view source)
- Estimated End of De-icing Time (view source)
- Estimated In-Block Time (view source)
- Estimated Landing Time (view source)
- Estimated Off-Block Time (view source)
- Estimated Ready for De-icing Time (view source)
- Estimated Take-Off Time (view source)
- Estimated Taxi-In Time (view source)
- Estimated Taxi-Out Time (view source)
- Estimated Time of Arrival (view source)
- Estimated Turn-round Time (view source)
- European ATM Enterprise Architecture (view source)
- Extended Flight Plan (view source)
- Final approach (view source)
- Flight Intent (view source)
- Flight Object (view source)
- Flight level (view source)
- Focus area (view source)
- Foreign Object Damage (view source)
- Foreign Object Debris (view source)
- Framework (view source)
- Free Routing (view source)
- Free Routing Airspace (view source)
- Full Operational Capability (view source)
- Function (view source)
- Functional block (view source)
- Global ATM performance hierarchy (view source)
- Goal (view source)
- Governance (view source)
- Great Circle (view source)
- Ground Automation Intent (view source)
- Ground Speed Profile (view source)
- Ground delay (view source)
- High ATCO Productivity Needs (view source)
- High Capacity Needs ACCs (view source)
- High Capacity Needs Airports (view source)
- High Capacity Needs TMAs (view source)
- Human Performance (view source)
- Implementation of ATM functionalities (view source)
- In-Block (view source)
- Industrialisation of ATM functionalities (view source)
- Influence Diagram (view source)
- Influence Model (view source)
- Influencing Factor (view source)
- Information Element (view source)
- Information Entity (view source)
- Information Exchange (view source)
- Information Exchange Requirement (view source)
- Information flow (view source)
- Information flow provider (view source)
- Information flow type (view source)
- Information model (view source)
- Information object (view source)
- Information product (view source)
- Information requirement (view source)
- Infrastructure System (view source)
- Initial Operational Capability (view source)
- Initial Operational Capability Optimal (view source)
- Initial Reference Business or Mission Trajectory (view source)
- Initial Shared Business or Mission Trajectory (view source)
- Instrument flight procedure (view source)
- Integrated Network Management and Extended ATC Planning (view source)
- Integrated Roadmap (view source)
- Intended constraint update (view source)
- Interface (view source)
- Intermediate Approach (view source)
- Interoperability (view source)
- Interoperable (view source)
- Key Feature (view source)
- Key Performance Area (view source)
- Key Performance Indicator (view source)
- Land and Hold Short Operation (view source)
- Landing (view source)
- Landing Stabilisation Speed Profile (view source)
- Legacy (view source)
- Level (view source)
- Level constraint (view source)
- Level off (view source)
- Level range constraint (view source)
- Logical architecture (view source)
- Low Capacity Needs ACCs (view source)
- Low Capacity Needs Airports (view source)
- Low Capacity Needs TMAs (view source)
- Low-cost air carrier (view source)
- Managed Airspace (view source)
- Marginal crew costs (view source)
- Master Data Management (view source)
- Medium ATCO Productivity Needs (view source)
- Medium Capacity Needs ACCs (view source)
- Medium Capacity Needs Airports (view source)
- Medium Capacity Needs TMAs (view source)
- Medium/Short Term Planning (view source)
- Metering Point (view source)
- Methodology (view source)
- Milestone (view source)
- Milestone Approach Concept Element (view source)
- Military Mission Trajectory (view source)
- Military Variable Profile Area (view source)
- Minimum Turn-round Time (view source)
- Ministry of Defence Architecture Framework (view source)
- Multi-Criteria Decision Analysis (view source)
- NATO Architecture Framework (view source)
- Need (view source)
- Net Present Value (view source)
- Net Present Value risk profile (view source)
- Net-centric (view source)
- Network Management Function (view source)
- Network Operations Plan (view source)
- Node (view source)
- Nominal weather condition (view source)
- OFA Milestone (view source)
- Observation (view source)
- Off-Block (view source)
- Open Loop Clearance (view source)
- Open Loop Instruction (view source)
- Operating environment (view source)
- Operational Concept (view source)
- Operational Focus Area (view source)
- Operational Improvement IOC date (view source)
- Operational Improvement Step (view source)
- Operational Improvement step FOC date (view source)
- Operational Package (view source)
- Operational Scenario (view source)
- Operational improvement (view source)
- Operational object (view source)
- Operational sub-package (view source)
- Optional enabler (view source)
- Organisation (view source)
- Pair-wise separation (view source)
- Passenger load factor (view source)
- Passenger opportunity cost (view source)
- Passenger value of time (view source)
- Pending route (view source)
- Performance (view source)
- Performance Assessment (view source)
- Performance Driver Indicator (view source)
- Performance Expectation (view source)
- Performance Indicator (view source)
- Performance Needs (view source)
- Performance Needs Envelope (view source)
- Performance ambition (view source)
- Performance case (view source)
- Performance framework (view source)
- Performance management process (view source)
- Performance scheme (view source)
- Performance target (view source)
- Performance-based approach (view source)
- Performance-based navigation (view source)
- Physical Asset (view source)
- Pilot Common Project (view source)
- Pilot Intent (view source)
- Planned End of Deployment (view source)
- Planned Full Benefit (view source)
- Planned Start of Benefit (view source)
- Planned Start of Deployment (view source)
- Planned route (view source)
- Post flight phase (view source)
- Pre-departure (view source)
- Precision Trajectory (view source)
- Predefined Route (view source)
- Primary delay (view source)
- Primary projects (view source)
- Product (view source)
- Project (view source)
- Project Milestone (view source)
- Project Work Breakdown Structure (view source)
- Project deliverable (view source)
- Property (view source)
- Protocol (view source)
- Queue management (view source)
- Reactionary delay (view source)
- Reactionary delay multiplier (view source)
- Reference Airspeed Profile (view source)
- Reference Business or Mission Trajectory (view source)
- Reference operating environment (view source)
- Reference scenario (view source)
- Regional air carrier (view source)
- Required Surveillance Performance (view source)
- Required Time of Arrival (view source)
- Required enabler (view source)
- Required navigation performance (view source)
- Requirement (view source)
- Resource Interaction (view source)
- Responsibility (view source)
- Revision of the Reference Business or Mission Trajectory (view source)
- Risks, Issues, Opportunities (view source)
- Role (view source)
- Runway contaminants (view source)
- Runway occupancy time (view source)
- SESAR Programme (view source)
- SESAR Solutions (view source)
- SESAR deployment (view source)
- SJU Work Programme (view source)
- SWIM profile (view source)
- SWIM registry (view source)
- Scheduled In-Block Time (view source)
- Scheduled Off-Block Time (view source)
- Scrum (view source)
- Separation constraint (view source)
- Separator (view source)
- Service (view source)
- Service Oriented Architecture (view source)
- Service activity (view source)
- Service attribute (view source)
- Service catalogue (view source)
- Service contract (view source)
- Service function (view source)
- Service instance (view source)
- Service interaction (view source)
- Service interface (view source)
- Shared Business or Mission Trajectory (view source)
- Short Term ATFCM Measures (view source)
- Solution scenario (view source)
- Spacing constraint (view source)
- Spacing minimum pairs (view source)
- Spacing practice (view source)
- Staging area (view source)
- Stakeholder (view source)
- Standard (view source)
- Standard Instrument Departure (view source)
- Standard Procedural Air Speed Profile (view source)
- Story Board Step (view source)
- Strategic delay (view source)
- Sub-Operating Environment (view source)
- Surface Manager (view source)
- Synthetic Vision System (view source)
- System (view source)
- System port (view source)
- System-Wide Information Management (view source)
- TBS rules (view source)
- Tactical delay (view source)
- Take off (view source)
- Target Landing Time (view source)
- Target Off-Block Time (view source)
- Target Start Up Approval Time (view source)
- Target Start Up Time (view source)
- Target Take-Off Time (view source)
- Target Time (view source)
- Target Time Over (view source)
- Target Time of Arrival (view source)
- Taxi-in (view source)
- Taxi-in Phase (view source)
- Taxi-out (view source)
- Taxi-out Phase (view source)
- Technical architecture (view source)
- Terminal Manoeuvring Areas % increase over time (view source)
- Terminal Manoeuvring Areas Peak movements/hour (view source)
- Terminal Manoeuvring Areas daily demand (view source)
- Time Based Operations (view source)
- Time Value of Money (view source)
- Time-Based Separation (view source)
- Trajectory (view source)
- Trajectory (4D) (view source)
- Trajectory Adjustment through Constraint of Time (view source)
- Trajectory Control by Ground Based Speed Adjustments (view source)
- Trajectory Management Requirement (view source)
- Trajectory management (4D) (view source)
- Trajectory-Based Operations (view source)
- Turn-round (view source)
- Turnaround Integration in Trajectory And Network (view source)
- Uncertainty (view source)
- Unmanaged Airspace (view source)
- Update of the Reference Business or Mission Trajectory (view source)
- User Defined Segment (view source)
- User Driven Prioritisation Process (view source)
- User Preferred Route (view source)
- User Preferred Trajectory (view source)
- V4 start/finish (view source)
- V5 Deployment Phase (view source)
- V5 start/finish (view source)
- Validation Exercise (view source)
- Validation Objective Result (view source)
- Validation targets (view source)
- Value of Statistical Life (view source)
- Variable Taxi Time (view source)
- What-if Flight Object (view source)
- Wind Conditions Profile (view source)
- Template:EmbeddedContent (view source)
- Template:EndOfDocument (view source)
- Template:EndOfEmbeddedContent (view source)
- Template:HeadOfDocument (view source)
- Template:Llthead (view source) (protected)
- Template:Lltr (view source) (protected)
- Template:Lrthead (view source) (protected)
- Template:Lrtr (view source) (protected)
- Template:Semantic table (view source) (protected)
Return to FullDescription:SESAR.