Enabler FOC date

From EUROCONTROL ATM Lexicon
Revision as of 17:14, 11 June 2015 by Ipigur (Talk | contribs) (Created page with '{{semantic_table |term=Enabler FOC date |status= |mandatory= |synonyms= |categories=<noinclude>Category:Common</noinclude> |contexts=Context::SESAR |related_entrie…')

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Jump to: navigation, search
Link Semantic Value
Term Enabler FOC date
Status


Mandatory for


Contexts

SESAR

Categories
Synonyms


Related entries

Full Operational Capability (FOC)

Broader term


Narrower term


Abbreviation

  
Enabler FOC date

Definition

  
Enabler FOC dateIs the date by which the operational capability of the enabler is achieved by all Stakeholders involved.

Definition Source

  
Enabler FOC dateSESAR Deployment Packages and Scenarios Methodology (D05-001, Ed. 01.00.04, 2013)

Note

  
Enabler FOC date