Difference between revisions of "Enabler FOC date"

From EUROCONTROL ATM Lexicon
Jump to: navigation, search
[unchecked revision][checked revision]
(Created page with '{{semantic_table |term=Enabler FOC date |status= |mandatory= |synonyms= |categories=<noinclude>Category:Common</noinclude> |contexts=Context::SESAR |related_entrie…')
 
(reviewed)
Line 27: Line 27:
 
{{#set:note=}}
 
{{#set:note=}}
 
{{#ask: [[Enabler FOC date]] | ?note= }}
 
{{#ask: [[Enabler FOC date]] | ?note= }}
 +
 +
=== Lexicon Release ===
 +
Lexicon Release 2015.1
 +
 
{{EndOfDocument}}
 
{{EndOfDocument}}

Revision as of 08:46, 29 July 2015

Link Semantic Value
Term Enabler FOC date
Status


Mandatory for


Contexts

SESAR

Categories
Synonyms


Related entries

Full Operational Capability (FOC)

Broader term


Narrower term


Abbreviation

  
Enabler FOC date

Definition

  
Enabler FOC dateIs the date by which the operational capability of the enabler is achieved by all Stakeholders involved.

Definition Source

  
Enabler FOC dateSESAR Deployment Packages and Scenarios Methodology (D05-001, Ed. 01.00.04, 2013)