Difference between revisions of "Enabler FOC date"
From EUROCONTROL ATM Lexicon
[unchecked revision] | [checked revision] |
(Created page with '{{semantic_table |term=Enabler FOC date |status= |mandatory= |synonyms= |categories=<noinclude>Category:Common</noinclude> |contexts=Context::SESAR |related_entrie…') |
(reviewed) |
||
Line 27: | Line 27: | ||
{{#set:note=}} | {{#set:note=}} | ||
{{#ask: [[Enabler FOC date]] | ?note= }} | {{#ask: [[Enabler FOC date]] | ?note= }} | ||
+ | |||
+ | === Lexicon Release === | ||
+ | Lexicon Release 2015.1 | ||
+ | |||
{{EndOfDocument}} | {{EndOfDocument}} |
Revision as of 08:46, 29 July 2015
Link | Semantic Value |
---|---|
Term | Enabler FOC date |
Status |
|
Mandatory for |
|
Contexts | |
Categories | |
Synonyms |
|
Related entries | |
Broader term |
|
Narrower term |
|
Abbreviation
Enabler FOC date |
Definition
Enabler FOC date | Is the date by which the operational capability of the enabler is achieved by all Stakeholders involved. |
Definition Source
Enabler FOC date | SESAR Deployment Packages and Scenarios Methodology (D05-001, Ed. 01.00.04, 2013) |
Note
Enabler FOC date |
Lexicon Release
Lexicon Release 2015.1