Airport Performance Gap
From EUROCONTROL ATM Lexicon
Revision as of 12:51, 5 July 2016 by Prisme-ops-admin (Talk | contribs) (Text replacement - "|mainlabel=- " to "")
Link | Semantic Value |
---|---|
Term | Airport Performance Gap |
Status |
|
Mandatory for |
|
Contexts | |
Categories | |
Synonyms |
|
Related entries | |
Broader term |
|
Narrower term |
|
Abbreviation
Airport Performance Gap |
Definition
Airport Performance Gap | The capacity performance gap at a specific airport has been calculated for each snapshot year by the ratio of traffic demand and runway capacity:
Airport Performance gap = traffic demand / runway capacity For values equal or greater than 1, it is considered that there is an airport performance gap since demand exceeds capacity. |
Definition Source
Airport Performance Gap | SESAR Performance Plan (pan-European regional and national) for ATM-MP Ed. 3 (D02, Ed. 01.00.03, 2015) |
Note
Airport Performance Gap |
Lexicon Release
Lexicon Release 2015.1