Difference between revisions of "Airport Performance Gap"
From EUROCONTROL ATM Lexicon
[unchecked revision] | [checked revision] |
(Created page with '{{semantic_table |term=Airport Performance Gap |status= |mandatory= |synonyms= |categories=<noinclude>Category:Common</noinclude> |contexts=Context::SESAR |related…') |
|||
Line 31: | Line 31: | ||
{{#set:note=}} | {{#set:note=}} | ||
{{#ask: [[Airport Performance Gap]] | ?note= }} | {{#ask: [[Airport Performance Gap]] | ?note= }} | ||
+ | |||
+ | === Lexicon Release === | ||
+ | Lexicon Release 2015.1 | ||
+ | |||
{{EndOfDocument}} | {{EndOfDocument}} |
Revision as of 15:54, 28 July 2015
Link | Semantic Value |
---|---|
Term | Airport Performance Gap |
Status |
|
Mandatory for |
|
Contexts | |
Categories | |
Synonyms |
|
Related entries | |
Broader term |
|
Narrower term |
|
Abbreviation
Airport Performance Gap |
Definition
Airport Performance Gap | The capacity performance gap at a specific airport has been calculated for each snapshot year by the ratio of traffic demand and runway capacity:
Airport Performance gap = traffic demand / runway capacity For values equal or greater than 1, it is considered that there is an airport performance gap since demand exceeds capacity. |
Definition Source
Airport Performance Gap | SESAR Performance Plan (pan-European regional and national) for ATM-MP Ed. 3 (D02, Ed. 01.00.03, 2015) |
Note
Airport Performance Gap |
Lexicon Release
Lexicon Release 2015.1