Difference between revisions of "Actual Turn-round Time"
From EUROCONTROL ATM Lexicon
[unchecked revision] | [unchecked revision] |
(Text replace - "{{definition" to "NEW_RELEASE__MASSIVE_UPDATE") |
|||
Line 4: | Line 4: | ||
|mandatory= | |mandatory= | ||
|synonyms= | |synonyms= | ||
− | |categories=[[Category:Aerodrome operations]] | + | |categories=<noinclude>[[Category:Aerodrome operations]]</noinclude> |
− | [[Category:Airport Operation]] | + | <noinclude>[[Category:Airport Operation]]</noinclude> |
|contexts=[[Context::SESAR]] | |contexts=[[Context::SESAR]] | ||
|related_entries=[[Actual In-Block Time]] | |related_entries=[[Actual In-Block Time]] | ||
Line 16: | Line 16: | ||
=== Abbreviation === | === Abbreviation === | ||
− | ATTT | + | {{#set:abbreviation=ATTT}} |
+ | {{#ask: [[Actual Turn-round Time]] | ?abbreviation= }} | ||
=== Definition === | === Definition === | ||
− | + | {{#set:definition=Time difference between the Actual off-block time (AOBT) minus the Actual in-block time (AIBT) | |
− | {{definition | + | |
− | + | ||
}} | }} | ||
+ | {{#ask: [[Actual Turn-round Time]] | ?definition= }} | ||
=== Definition Source === | === Definition Source === | ||
− | EUROCONTROL, ACI, IATA (2010) Airport CDM Implementation Manual, Issue 3.1., July 2010 | + | {{#set:defsource=EUROCONTROL, ACI, IATA (2010) Airport CDM Implementation Manual, Issue 3.1., July 2010}} |
+ | {{#ask: [[Actual Turn-round Time]] | ?defsource= }} | ||
=== Note === | === Note === | ||
− | + | {{#set:note=}} | |
+ | {{#ask: [[Actual Turn-round Time]] | ?note= }} | ||
{{EndOfDocument}} | {{EndOfDocument}} |
Revision as of 10:38, 26 May 2011
Link | Semantic Value |
---|---|
Term | Actual Turn-round Time |
Status |
|
Mandatory for |
|
Contexts | |
Categories | |
Synonyms |
|
Related entries | |
Broader term |
|
Narrower term |
|
Abbreviation
Actual Turn-round Time | ATTT |
Definition
Actual Turn-round Time | Time difference between the Actual off-block time (AOBT) minus the Actual in-block time (AIBT) |
Definition Source
Actual Turn-round Time | EUROCONTROL, ACI, IATA (2010) Airport CDM Implementation Manual, Issue 3.1., July 2010 |
Note
Actual Turn-round Time |