4D Trajectory
From EUROCONTROL ATM Lexicon
Revision as of 16:11, 5 March 2010 by Afriesen (Talk | contribs) (Created page with '{{semantic_table |term= |status= |mandatory= |synonyms= |categories= |contexts= |related_entries= |broader_terms= |narrower_terms= }} {{HeadOfDocument}} === Abbreviati…')
Link | Semantic Value |
---|---|
Term | ' |
Status |
|
Mandatory for |
|
Contexts |
|
Categories |
|
Synonyms |
|
Related entries |
|
Broader term |
|
Narrower term |
|
Abbreviation
Definition
A set of consecutive segments linking waypoints and/or points computed by FMS (airborne) or by TP (ground) to build the vertical profile and the lateral transitions; each point defined by a longitude, a latitude, a level and a time.
Definition Source
SESAR Consortium (2007) CONOPS Acronyms and Definitions, Task 2.2.2 - Milestone 3, Document Number: DLT-0612-222-02-00