Difference between revisions of "4D Trajectory"
From EUROCONTROL ATM Lexicon
(Created page with '{{semantic_table |term= |status= |mandatory= |synonyms= |categories= |contexts= |related_entries= |broader_terms= |narrower_terms= }} {{HeadOfDocument}} === Abbreviati…') |
|||
Line 1: | Line 1: | ||
{{semantic_table | {{semantic_table | ||
− | |term= | + | |term=4D Trajectory |
|status= | |status= | ||
|mandatory= | |mandatory= |
Revision as of 16:13, 5 March 2010
Link | Semantic Value |
---|---|
Term | 4D Trajectory |
Status |
|
Mandatory for |
|
Contexts |
|
Categories |
|
Synonyms |
|
Related entries |
|
Broader term |
|
Narrower term |
|
Abbreviation
Definition
A set of consecutive segments linking waypoints and/or points computed by FMS (airborne) or by TP (ground) to build the vertical profile and the lateral transitions; each point defined by a longitude, a latitude, a level and a time.
Definition Source
SESAR Consortium (2007) CONOPS Acronyms and Definitions, Task 2.2.2 - Milestone 3, Document Number: DLT-0612-222-02-00