True Revision Process

From EUROCONTROL ATM Lexicon
Jump to: navigation, search
Link Semantic Value
Term True Revision Process
Status


Mandatory for


Contexts


Categories
Synonyms


Related entries

Slot Issue Time 2 (SIT 2)

Broader term


Narrower term


Abbreviation

TRP

Definition

the automatic mechanism that routinely attempts to improve the slot of allocated flights; for a given flight, the true revision process takes place after the Slot Allocation Message has been issued until a time parameter before the CTOT.

Definition Source

EUROCONTROL, Directorate Network Management, BASIC CFMU HANDBOOK, GENERAL & CFMU SYSTEMS, Ed. 15 (2011)

Note