Target Take-Off Time

From EUROCONTROL ATM Lexicon
Jump to: navigation, search
Link Semantic Value
Term Target Take-Off Time
Status


Mandatory for


Contexts

SESAR, EUROCONTROL

Categories
Synonyms


Related entries

Target Start Up Approval Time (TSAT)

Estimated Taxi-Out Time (EXOT)

ATC-DPI

Actual Take-Off Time (ATOT)

Calculated Take-Off Time (CTOT)

Estimated Take-Off Time (ETOT)

Broader term


Narrower term


Abbreviation

TTOT

Definition

1. An ATM computed take off time. It is not a constraint but a progressively refined planning time that is used to:

- refine the departure airport sequencing and optimization of RWY throughput

- plan the take-off in order to achieve targets at the destination and during flight, whilst maintaining optimum flight efficiency.

2. The Target Take Off Time taking into account the TOBT/TSAT plus the EXOT. Each TTOT on one runway is separated from other TTOT or TLDT to represent vortex and / or SID separation between aircraft.

Definition Source

1. SESAR Concept of Operations Step 2 Edition 2014 (Ed. 01.01.00)

2. EUROCONTROL/IATA/ACI, Airport CDM Implementation Manual, V.4, March 2012

Note

Lexicon Release

Lexicon Release 2016.1