Search by property
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Original Route + (5 July 2016 12:34:07)
- Originating Region Code Assignment Method + (5 July 2016 12:34:07)
- Out, Off, On, In + (5 July 2016 12:34:07)
- Over-delivery + (5 July 2016 12:34:08)
- Over-interrogation + (5 July 2016 12:34:08)
- Overload + (5 July 2016 12:34:08)
- PCN Evaluation Method + (5 July 2016 12:34:08)
- PCN Maximum Allowable Tire Pressure Category + (5 July 2016 12:34:09)
- PCN Maximum Allowable Tire Pressure Value + (5 July 2016 12:34:09)
- PCN Pavement Subgrade Strength Category + (5 July 2016 12:34:09)
- Pair-wise separation + (5 July 2016 12:34:09)
- Participating area + (5 July 2016 12:34:10)
- Passenger-kilometres performed + (5 July 2016 12:34:10)
- Passenger Service Description + (5 July 2016 12:34:10)
- Passenger Service Type + (5 July 2016 12:34:11)
- Passenger air carrier + (5 July 2016 12:34:11)
- Passenger aircraft + (5 July 2016 12:34:11)
- Passenger load factor + (5 July 2016 12:34:11)
- Passenger opportunity cost + (5 July 2016 12:34:12)
- Passenger tonne-kilometres performed + (5 July 2016 12:34:12)
- Passenger value of time + (5 July 2016 12:34:12)
- Pavement Classification Number + (5 July 2016 12:34:12)
- Pavement Type for PCN Determination + (5 July 2016 12:34:13)
- Pending route + (5 July 2016 12:34:13)
- Performance + (5 July 2016 12:34:13)
- Performance-based approach + (5 July 2016 12:34:13)
- Performance Assessment + (5 July 2016 12:34:14)
- Performance Driver Indicator + (5 July 2016 12:34:14)
- Performance-based navigation + (5 July 2016 12:34:14)
- Performance Expectation + (5 July 2016 12:34:15)
- Performance Indicator + (5 July 2016 12:34:15)
- Performance Needs + (5 July 2016 12:34:15)
- Performance Needs Envelope + (5 July 2016 12:34:16)
- Performance ambition + (5 July 2016 12:34:16)
- Performance case + (5 July 2016 12:34:16)
- Performance framework + (5 July 2016 12:34:17)
- Performance gap + (5 July 2016 12:34:17)
- Performance management process + (5 July 2016 12:34:17)
- Performance modelling + (5 July 2016 12:34:17)
- Performance monitoring + (5 July 2016 12:34:18)
- Performance review + (5 July 2016 12:34:18)
- Performance scheme + (5 July 2016 12:34:18)
- Performance target + (5 July 2016 12:34:18)
- Physical Asset + (5 July 2016 12:34:19)
- Pilot Common Project + (5 July 2016 12:34:19)
- Pilot Controlled Lighting + (5 July 2016 12:34:19)
- Pilot Intent + (5 July 2016 12:34:20)
- Pilot weather report + (5 July 2016 12:34:20)
- Planetary boundary layer + (5 July 2016 12:34:20)
- Planned End of Deployment + (5 July 2016 12:34:20)
- Planned Full Benefit + (5 July 2016 12:34:20)
- Planned Start of Benefit + (5 July 2016 12:34:21)
- Planned Start of Deployment + (5 July 2016 12:34:21)