Search by property

Jump to: navigation, search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Defsource" with value "SESAR ADD Step 2 – 2014 Edition (D97, Ed 00.03.01, 2014)". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • Flying angel tracks  + (NORTH ATLANTIC TREATY ORGANISATION RESEARCH AND TECHNOLOGY ORGANISATION (2005) AC/323(SET-063)TP/49 RTO EDUCATIONAL NOTES EN SET-063 Knowledge-Based Radar Signal and Data Processing)
  • Wide area multilateration  + (National Aerospace Laboratory NLR (2005), NLR-CR-2004-472, Wide Area Multilateration, Report on EATMP TRS 131/04, Version 1.1)
  • Need  + (OASIS, Reference Model for Service Oriented Architecture 1.0, Public Review Draft, 28 April 2008, Chapter 3.3 [http://docs.oasis-open.org/soa-rm/soa-ra/v1.0/soa-ra-pr-01.pdf])
  • Code  + (OECD Glossary of Statistical terms [http://stats.oecd.org/glossary/search.asp])
  • Carbon dioxide equivalent  + (OECD Glossary of statistical terms (2005) referred source: Environmental Indicators for Agriculture – Vol. 3: Methods and Results, OECD, 2001, glossary, pages 389-391)
  • Turn-round  + (OED Oxford English Dictionary, online [http://www.oed.com/])
  • Approach procedure with vertical guidance  + (Official definition, ICAO (2005), Annex 2, Rules of the Air)
  • Localizer performance with vertical guidance  + (Official definition, ICAO (2006), PANS-OPS/I, Procedures for Air Navigation Services — Aircraft Operations — Flight Procedures [Doc 8168/I])
  • Minimum safe approach speed  + (Olympic Air Virtual [http://www.oav.gr/newsite/index.php?option=com_content&view=article&id=124:minimum-approach-speed&catid=50:aircraft-performance&Itemid=137&lang=en])
  • Basic encoding rules  + (Open DS Wiki (2010) [https://www.opends.org/wiki/page/DefBasicEncodingRules])
  • Concern  + (Open Group Architecture Framework (TOGAF), Definitions [http://www.opengroup.org/architecture/togaf9-doc/arch/chap03.html#tag_04_34])
  • Data warehouse  + (Oxford English Dictionary (2004))
  • ATM Master Plan  + (REGULATION (EC) No 1070/2009 OF THE EUROPE
    REGULATION (EC) No 1070/2009 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 October 2009 amending Regulations (EC) No 549/2004, (EC) No 550/2004, (EC) No 551/2004 and (EC) No 552/2004 in order to improve the performance and sustainability of the European aviation system
    ainability of the European aviation system)
  • Functional Airspace Block  + (REGULATION (EC) No 1070/2009 OF THE EUROPE
    REGULATION (EC) No 1070/2009 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 October 2009 amending Regulations (EC) No 549/2004, (EC) No 550/2004, (EC) No 551/2004 and (EC) No 552/2004 in order to improve the performance and sustainability of the European aviation system
    ainability of the European aviation system)
  • European Air Traffic Management Network  + (REGULATION (EC) No 549/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 10 March 2004 laying down the framework for the creation of the single European sky (the framework Regulation))
  • Airspace block  + (Regulation (EC) No 549/2004 of the European Parliament and of the Council of 10 March 2004 laying down the framework for the creation of the single European sky (the framework Regulation))
  • Business Application  + (SEBIS)
  • Domain  + (SEBIS)
  • Information flow provider  + (SEBIS)
  • Information flow type  + (SEBIS)
  • Project deliverable  + (SESAR (2015) SESAR Programme Execution Guidelines: WP & Project Management Execution Guidelines, version 02.02.00)
  • Risks, Issues, Opportunities  + (SESAR (2015), WP & Project Management Execution Guidelines, Ed. 02.02.00)
  • Project Work Breakdown Structure  + (SESAR (2015), WP & Project Management Execution Guidelines, Ed. 02.02.00)
  • Project Milestone  + (SESAR (2015), WP & Project Management Execution Guidelines, Ed. 02.02.00)
  • OFA Milestone  + (SESAR (2015), WP & Project Management Execution Guidelines, Ed. 02.02.00)
  • Physical Asset  + (SESAR ADD Step 2 – 2014 Edition (D97, Ed 00.03.01, 2014))