Search by property

Jump to: navigation, search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Defsource" with value "EUROCONTROL (2004) EATM glossary, June 2004". Since there have been only a few results, also nearby values are displayed.

Showing below up to 29 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ATS environment data base  + (EUROCONTROL (2004) EATM glossary, June 2004 and EUROCONTROL MANUAL FOR AIRSPACE PLANNING, Volume 2 (2003))
  • Advanced Airport Approach Procedures including Validation and Elaboration  + (EUROCONTROL (2004) EATMP glossary, June 2004)
  • En-Route Manager  + (EUROCONTROL (2004) EVP EMAN Prototype Specification Document)
  • Air traffic flow management airport delay  + (EUROCONTROL (2004), EATM glossary 2004, ref. EUROCONTROL CFMU)
  • Upper Flight Information Region  + (EUROCONTROL (2005) Glossary for Flight Statistics & Forecasts, v. 1.0 [http://www.eurocontrol.int/statfor/gallery/content/public/documents/glossary%20v1.0.pdf])
  • Commonly Agreed Methodology for Airport Airside Capacity Assessment  + (EUROCONTROL (2005) Institute of Air Navigation Services, PIATA+ and CAMACA Introduction [http://www.eurocontrol.int/airports/gallery/content/public/pdf/PIATA%20CAMACA%20Introduction.pdf])
  • Primary delay  + (EUROCONTROL (2005) Performance Review Commission, Performance Review Report 2004 (PRR 8), Glossary)
  • Reactionary delay  + (EUROCONTROL (2005) Performance Review Commission, Performance Review Report 2004 (PRR 8), Glossary)
  • Composite flight hour  + (EUROCONTROL (2005) Performance Review Report (PRR8) "An assessment of Air Traffic Management in Europe during the calender year 2004", Annex VI, Glossary)
  • Air Traffic Control Unit Airspace  + (EUROCONTROL (2005), EUROCONTROL Glossary for Flight Statistics & Forecasts, v.1.0 [http://www.eurocontrol.int/statfor/gallery/content/public/documents/glossary%20v1.0.pdf])
  • Aerodrome movement  + (EUROCONTROL (2005), doc. "Definition of A-SMGCS Implementation Levels", Ed.1.1)
  • CDM Airport  + (EUROCONTROL (2006) Airport CDM Operational Concept Document, Ed. 3.0)
  • CDM in adverse conditions  + (EUROCONTROL (2006) Airport CDM Operational Concept Document, Ed. 3.0)
  • CDM turn-round process  + (EUROCONTROL (2006) Airport CDM Operational Concept Document, Ed. 3.0)
  • Tactical ATFCM  + (EUROCONTROL (2006) CFMU website URL: http://www.cfmu.eurocontrol.int/cfmu/public/standard_page/about_meetobjectives.html)
  • Pre-tactical ATFCM  + (EUROCONTROL (2006) CFMU website URL: http://www.cfmu.eurocontrol.int/cfmu/public/standard_page/about_meetobjectives.html)
  • Strategic ATFCM  + (EUROCONTROL (2006) CFMU website URL: http://www.cfmu.eurocontrol.int/cfmu/public/standard_page/about_meetobjectives.html)
  • Initial flight plan  + (EUROCONTROL (2006) COMMISSION REGULATION (EC) No 1033/2006 of 4 July 2006 laying down the requirements on procedures for flight plans in the pre-flight phase for the single European sky)
  • Interaction  + (EUROCONTROL (2006) Complexity Metrics for ANSP, Benchmarking Analysis, Prepared by the ACE Working Group on Complexity, Report commissioned by the Performance Review Commission)
  • Air Traffic Management Organisation  + (EUROCONTROL (2006) Study Report on Selected Safety Issues for Staffing ATC Operations, Ed. 1.0)
  • ATC-DPI  + (EUROCONTROL (2006), Airport CDM Operational Concept Document, Ed. 3)