Safety and Performance Requirements
From EUROCONTROL ATM Lexicon
Link | Semantic Value |
---|---|
Term | Safety and Performance Requirements |
Status |
|
Mandatory for |
|
Contexts |
|
Categories | |
Synonyms |
|
Related entries | |
Broader term |
|
Narrower term |
|
Abbreviation
SPR
Definition
"requirements defining the minimum operational, safety and performance requirements for the implementation of a particular system (focusing on the equipment)"
Definition Source
EUROCONTROL (2009) EUROCONTROL, doc. "WAM Generic Guidance Process - Volume 1, Process Description", SUR Reference No.: SUR-WAM-GEN-PRO V1, Edition Number: 02.00, Edition Date: 08/01/2009, Status: Final Release