UEFA Conference League Final 2026 Final of the UEFA Conference League Final in Leipzig on 27th May with addtional traffic on 26th and 28th May (supporters) . 26/05/2026 28/05/2026 No information reported
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Closure of RWY 09L/27R Regular maintenance works 05/10/2026 09/10/2026 Yes
Closure of RWY 09L/27R Regular maintenance works 01/10/2026 02/10/2026 Yes
Closure of RWY 09R/27L Regular maintenance works 02/09/2026 11/09/2026 No
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Rwy 15/33 closure RWY maintenance work 28/09/2026 24/10/2026 Yes
Airport nightly closure Aerodrome closure due to renovation of the runway intersection. 20/09/2026 21:30 21/09/2026 03:30 Yes
Airport nightly closure Aerodrome closure due to renovation of the runway intersection. 19/09/2026 19:00 20/09/2026 05:00 Yes
Airport nightly closure Airport emergency exercise 04/07/2026 21:30 05/07/2026 03:30 Yes
Airport nightly closure Aerodrome closure due to renovation of the runway intersection. 31/05/2026 21:30 01/06/2026 03:30 Yes
Airport nightly closure Aerodrome closure due to renovation of the runway intersection. 30/05/2026 20:00 31/05/2026 04:00 Yes
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
RWY 08/26 closed for maintenance RWY will be closed. 29/04/2026 30/09/2026 No
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
ILS/DME obras sustitución RWY 30 Ver suplemento AIP España 135/25 NOTAM E0981/26 07/08/2025 07/08/2026 Yes
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Terminal Area/building refurbishment Refurbisment of terminal building processor, pier A and D 03/11/2022 28/12/2026 No
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Pavement adequacy APRON pavement repair 01/06/2026 31/05/2027 No
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Works on 3A/3B/3C and 7A/7B/7C stands Passengers boarding bridges replacement 05/2026 10/2026 Yes
Works on 8B/8C stands Passengers boarding bridges replacement 12/11/2025 05/2026 Yes
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Implementation of a new Pre-Departure Sequencer GO-Live for the new PDS software implementation in Paris CDG 09/06/2026 TBD No information reported
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Refurbishment works runway 15/33 refurbishment works runway 15/33. 15/04/2026 21/05/2026 Yes
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Construction of a multi-level parking complex and a new railway station with direct interchange to the metro Approximately less than 200,000 square meters of terminal front areas will be affected by the construction of multi-storey parking facilities. Furthermore, the construction of the new railway station with direct interchange with the extension of the metro at Santa Maria Goretti is planned. The... 2034 TBD No information reported
Development of an Environmental Hub The Environmental Hub will occupy a partially paved and generally underutilized area. The site will cover approximately 58,000 square meters, featuring green spaces and pedestrian pathways accessible to the public. 2034 TBD No information reported
Establishment of a sustainability energy hub (MICROGRID) for the entire airport area To the west of Terminal A, adjacent to the airside-landside boundary, a large open area is designated for future developments aimed at sustainable mobility. Development strategies will be tied to ongoing technological innovations and will aim to create a hub for the energy sustainability of the... 2034 TBD No information reported
Construction of a new runway Construction of a new runway (length of 3000 meters, located south of the existing runway, which will be converted into a taxiway), including related taxiways and RESA (suitable for operations with aircraft of ICAO Reference Code ECHO) 2033 TBD No information reported
Construction of new Terminals B and C within the passenger terminal system: The new Terminal B, with a total width of approximately 130 meters, will be developed over four above-ground levels and one underground level. It will have a direct connection to the existing Fontanarossa Terminal. 2032 TBD No information reported
Relocation of the Aeroclub area Relocation of the Aeroclub area 2030 TBD No information reported
Development of a cargo hub (including cargo building and apron) and cargo taxiway The new cargo area, which will be developed to the north of the airport site, will include an apron area adequately sized to meet the estimated demand and a new taxiway. It also involves the construction of a new cargo building with a footprint of approximately 3,500 square meters and associated... 2030 TBD No information reported
Expansion of the airport area towards the Southwest and South The objective of the intervention is to significantly increase the number of stands and position them in a strategic area that is easily accessible from the terminal via an interchange. 2030 TBD No information reported
Reconfiguration of the West Apron and ramp service area The master plan envisions a single, compact area near the West Apron and in a central position relative to the runway, 2029 TBD No information reported
Expansion of Terminal A The main interventions planned for Terminal A are as follows: - Expansion of the boarding area 7-16 on the airside, with an overall increase of approximately 2800 square meters. - Enlargement of the Extra-Schengen area, with a multi-level increase of approximately 2000 square meters. 2029 TBD No information reported
A-CDM Full Implementation – Enhanced Data Exchange with Network Manager (ETFMS) Following full A-CDM implementation, a consolidated and fully operational data exchange (FUM/EFD/DPI) framework between the Airport A-CDM system and the Network Manager (ETFMS environment) is established, ensuring seamless integration of operational milestones and flight data processing. 2026 Q4 TBD Yes
T1 Phase – A-CDM Implementation Validation (Q3 2026) In line with the EUROCONTROL A-CDM Implementation Roadmap, the T1 validation phase for A-CDM implementation will be conducted within Q3 2026 (01 July – 30 September 2026). The scope of this phase includes end-to-end validation of AFTN-based messaging connectivity supporting A-CDM processes, with... 2026 Q3 TBD Yes
Implementation of A-CDM - Evaluation of Live Data (T2) phase DPI messages will be delivered to the ETFMS Operational Evaluation system (OPEVAL). RMK: The exact date will be communicated through the publication of dedicated NOTAMs 2026 Q3 TBD Yes
ATFCM CAPACITY ADJUSTMENT – CATANIA CTR (10 A/M) DUE TO PRIMARY RADAR MAINTENANCE AND BACK-UP RADAR CONFIGURATION Following the scheduled preventive maintenance of the primary radar system ATCR33-S/SIR-M, planned on Wednesday 20 May 2026 (1100Z–1500Z), and the concurrent operation of the ATCR33T-SIR-M backup radar, the implementation of the following ATFCM/AFTM measure is required in order to maintain the... 20/05/2026 11:00 20/05/2026 15:00 Yes
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
TWY AND TAXILANE PARTIAL RESURFACING RESURFACING OF TWY TP AND PARTIAL RESURFACING OF ADJACENT SECTOR OF TAXILANE Z 11/05/2026 03/06/2026 23:55 Yes
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
New pear L Construction of new pear L 2030 2034 No information reported
New pear K Construction of new pear K 2030 2034 No information reported
New Terminal EST Construction of new Terminal in the est side of the airport: 2029 2034 No information reported
Construction of new RWY New RWY 2029 2033 No information reported
New pear M Construction of new pear M 2028 2030 No information reported
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
TWY R3 closed TWY R3 closed due to WIP for connection with future new TWY. 12/05/2026 23:00 22/06/2026 04:00 Yes
Entry/Exit System (EES) In light of the planned full implementation of the Entry/Exit System (EES) with 100% passenger registration, significant operational constraints may arise at border control points across the Schengen area. Current operational experience indicates that EES processing can increase border control... 29/03/2026 24/10/2026 No information reported
Data link clearance Data link clearance with technical issues related to on board avionics component. In case of rejection, please revert to voice and ask Delivery/ Ground/ Tower, whenever applicable, according to the Departure ATIS, for the Enroute ATC Clearance. 31/07/2025 11:07 TBD Yes
NEW TEMPORARY STANDS 001, 002, 003 AND 004 IN USE. TWY A1 CENTRE LINE DEVIATED As of 05:00 UTC of the 17th of July, new temporary stands 001, 002, 003 and 004 will be in use and TWY A1 centre line will be deviated. Follow-me is mandatory for pushback, start-up, taxi-in and taxi-out of apron 10, under Tower and Airport Operations coordination. New services roads, south and... 17/07/2025 06:00 TBD Yes
TWY M1 RENAMED R1 AND TWY M2 RENAMED R2 AND R3. After 05:00UTC of the 15th of July, TWY M1 will be renamed as R1, and TWY M2 will be renamed as TWY R2 and R3. Until the 16th of July, some of the signs can be covered, or absent. Follow-me guidance available upon request. REF AIP SUP036/2025: phases 0 and 1B activated. 15/07/2025 05:00 TBD Yes
MAJOR WORKS - EXTENSION OF APRON 10 AND NEW APRON 23 With the objective of increasing the number of contact stands and replacing a Temporary Parking Area for aircraft, this project will be developed at the southeast area of Lisbon (Humberto Delgado) Airport. It consists of the extension of apron 10, construction of a new Apron 23, taxiways to... 01/02/2025 31/08/2027 Yes
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Rwy closure at LPPT RWY closure due to pavement repairment and tests. Available for medevac and hops VFR flights. NOTAM A2855/26. 21/05/2026 00:30 21/05/2026 03:00 Yes
Ongoing
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
RWY 06L/24R CLOUSURE RWY 06L/24R will be closed according to NOTAM B7835/25. 29/03/2026 23:00 24/10/2026 01:59 Yes
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
RWY 06L/24R WINTER SEASON CLOSURE RWY 06L/24R SHALL BE TEMPORARILY CLOSED TO DEP AND ARR TRAFFIC DUE TO RWY MAINTENANCE 25/10/2026 23:00 27/03/2027 02:00 No
Not Started
Title Description Start Date (UTC) End Date (UTC) Impact(s) ?
Expo 2027 Belgrade International Specialized Exhibition Expo 2027 Belgrade 15/05/2027 15/08/2027 No information reported