Difference between revisions of "Performance Monitoring"
Line 9: | Line 9: | ||
* Monitor and report Overall End to End Performance vs Requirements | * Monitor and report Overall End to End Performance vs Requirements | ||
* Monitor the VDLM2 frequency sharing and channel deployment. | * Monitor the VDLM2 frequency sharing and channel deployment. | ||
− | The CRO is expected to fulfil these tasks via the gathering and analysis of operational data at the various levels, using tools developed for the purpose. This service is not yet available but is planned as a part of the | + | The CRO is expected to fulfil these tasks via the gathering and analysis of operational data at the various levels, using tools developed for the purpose. This service is not yet available but is planned as a part of the CRO Action Plan (which is in the [library]). |
Revision as of 15:49, 5 March 2012
The DLS-CRO aims to monitor the performance of the CPDLC, ATN, VDL Mode 2 and communication service provision systems at a European level, since these must all interoperate successfully in order to generate the expected benefits. The DLS IR requires ATS providers to monitor the quality of service provided. This is the responsibility of each ATS Provider and the DLS-CRO is not intended to replace that function, but may provide support by gathering statistical data. The CRO is required to :
- Collect data and prepare monthly and overall CPDLC traffic statistics
- CPDLC
- ATN
- VDL2
- Collect data and prepare monthly operational CPDLC statistics per ANSPs and Airlines
- Monitor and report Overall End to End Performance vs Requirements
- Monitor the VDLM2 frequency sharing and channel deployment.
The CRO is expected to fulfil these tasks via the gathering and analysis of operational data at the various levels, using tools developed for the purpose. This service is not yet available but is planned as a part of the CRO Action Plan (which is in the [library]).